The water connection beneath our sink in the hall bath sprung a slow leak. The problem was that we didn't discover the leak until months later. Sooo, the water had leaked all the way through the vanity, to the floor, along the base plate to the back wall then under the base and into the adjoining guest bedroom. We finally found it due to a musty smell from the carpet in the guest bedroom.
That discovery led to removing the vanity, some drywall, the carpet and while we were at it, a wall. We decided to do some remodeling since we had 1/3rd of the bathroom removed anyways.
Kenna helped me lay some replacement tiles which filled in the gap left by the old wall dividing the toilet from the vanity.
This is the adjoining guest bedroom with the lower 4 inches of drywall removed and a good look at the new bottom plate.
The floor is all patched up, just needs grout.
Supervising from her perch.
Quick break to enjoy the rainbow in the front yard.
Perhaps inspired by the rainbow, we decided to put arches up to add some character.
Slow process, but we are getting there.
And this is where it sits for awhile. Other projects and work will interfere in the near future. At least we have a usable bath and toilet.